Testing and Verification of LV and MV Switchgear Panels

Home > Services > Electrical Testing > Testing and Verification of LV and MV Switchgear Panels

Testing and Verification of LV and MV Switchgear Panels


Switchgear-panel validation at acceptance and during operation using injection, insulation, wiring and protection-loop tests.

Methods

  • Secondary and primary injection up to 3,000 A.
  • Insulation and impulse tests up to 70 kV.
  • Wiring validation and verification of the CT + relay + circuit-breaker protection loop.
  • Live CT testing.
  • LV/MV circuit-breaker testing, including contacts, coils and automation.

Collect information about the panel brand, type and characteristics, then test and verify its characteristics and wiring.